Lp | Customer | Facility Name | Scope od realization | Location | Description of works | Period of realization |
---|---|---|---|---|---|---|
21 | YARA Environmental Technologies GmbH | Division Laziska Gorne | OPTIMIZATION & MEASUREMENTS | Polska, Łaziska Górne |
Performing measurements according to PN-EN 14181: 2015-02 standard | 2020 |
22 | CIECH Soda Polska S.A. | CIECH Soda Polska Production plant in Janikowo | OPTIMIZATION & MEASUREMENTS | Polska, Janikowo |
Commissioning of the OP140 ZP Janikowo boiler | 2020 |
23 | CEZ Skawina S.A. | Instalacja Odazotowania Spalin SCR (nitka I) w CEZ Skawina S.A. | OPTIMIZATION & MEASUREMENTS | Polska, Skawina |
Verification of the first stage of measurements by a measurement company at the facility along with verification of the measurement report (DENOX – Line 1) | 2020 |
24 | CEZ Chorzów S.A. | CHP Elcho Chorzow | OTHER | Polska, Chorzów |
Realization of HCI reduction installation from flue gas at CEZ Chorzow S.A. (dry method - DSI) | 2020 |
25 | MLU Sp. z o.o. | Veolia Energia Poznań S.A. | OPTIMIZATION & MEASUREMENTS | Polska, Poznań |
Conducting research and development works aimed at optimizing the operation of boiler measuring devices | 2020 |
26 | Tauron Wytwarzanie S.A. | Division Power Plant Stalowa Wola | OPTIMIZATION & MEASUREMENTS | Polska, Stalowa Wola |
Measurements of the concentration of all inorganic gaseous chlorine compounds, expressed as HCl, in the flue gas from the OP-120 biomass-fired boiler located in TAURON Wytwarzanie S.A. - Division of the Stalowa Wola Power Plant in Stalowa Wola along with the certification of the technological measurement | 2020 |
27 | Biuro Budowy GE Power (Elektrownia Opole) | Division Power Plant Opole, Unit No. 5 | OPTIMIZATION & MEASUREMENTS | Polska, Opole |
Performing measurements to determine the characteristics of the dust meter | 2019 |
28 | Eltur Serwis Sp. z o.o. | Division Power Plant Turow | OTHER | Polska, Turów |
Support of the Project Team for the task: "Construction of the facilities of the New Unit carburizing system at PGE GiEK S.A. Turów Power Plant Division" | 2019-2020 |
29 | TAURON Wytwarzanie S.A. NJGT | 910 MW Unit with supercritical boiler | BOILER | Polska, Jaworzno |
Performing the function of Technologist - Technological Commissioning Coordinator in the field of Non-Block Economy with the Commissioning of the 910 MWe Unit in New Jaworzno Tauron Group | 2019-2020 |
30 | Przedsiębiorstwo Remontu i Montażu Urządzeń Energetycznych ENERGOSERWIS S.A. | CHP Pruszkow | BOILER | Polska, Pruszków |
Comprehensive commissioning and optimization of water boilers WR-25 K12 and WR 25/12-M K 13 | 2019-2020 |
31 | Przedsiębiorstwo Remontu i Montażu Urządzeń Energetycznych ENERGOSERWIS S.A. | CHP Pruszkow | BOILER | Polska, Pruszków |
Performing warranty measurements for the WR-25M K 12 Boiler | 2019 |
32 | Polimex Energetyka Sp. z o.o. | Division Complex Power Plants Dolna Odra, Power Plant Pomorzany, Szczecin | FLUE GAS CLEANING | Polska, Pomorzany, Szczecin |
Participation in the commissioning, including regulatory and test traffic on the investment task of the Employer entitled "Construction of FGD with semi-dry method together with dry ash distribution installation for two Benson OP-206 Boilers" | 2019-2020 |
33 | Eltur Serwis Sp. z o.o. | Division Power Plant Turow | BOILER | Polska, Turów |
Performing supervisory functions in all industries at the construction site of the New Carburzing System of 460 MW Unit fired with brown coal | 2019-2020 |
34 | ECO GmbH | BASF SE Ludwigshafen | ELEKTRYKA I AUTOMATYKA | Niemcy, Ludwigshafen |
Verification of I&EC installations and systems of technological lines | 2019 |
35 | GE Power Sp. z o.o. | Steelworks Dabrowa Gornicza | OPTIMIZATION & MEASUREMENTS | Polska, Dąbrowa Górnicza |
Carrying out warranty measurements for the installation of the DL1 and DL 3 sinter strip dust extractor and for the dedusting installation of distribution node number 8 (WR-8) | 2019 |
36 | RAFAKO S.A. | Division Power Plant Belchatow | FLUE GAS CLEANING | Polska, Bełchatów |
Construction Directorate for the task: "Comprehensive modernization of FGD at Units No. 8-12" | 2019-2020 |
37 | YARA Environmental Technologies GmbH | CHP Siekierki | ELEKTRYKA I AUTOMATYKA | Polska, Siekierki |
Performing the functions of the I&EC inspector | 2019-2020 |
38 | Biuro Budowy GE Power | ZW Nowa TAMEH POLSKA Sp. z o.o. Dąbrowa Górnicza | FLUE GAS CLEANING | Polska, Dąbrowa Górnicza |
Measurement of guaranteed parameters at the desulphurisation and denitrification plant | 2019 |
39 | Ecosorbtech Sp. z o.o. | CHP Elcho Chorzow | DOCUMENTATION & ANALYZES | Polska, Chorzów |
Implementation of a research and development project in the field of technological measurements of HCl, SO2, O2 concentrations | 2019 |
40 | Elpro GmbH | GDRA Kienbaum | ELEKTRYKA I AUTOMATYKA | Niemcy, Kienbaum |
Development and implementation of a cold commissioning program for electrical and measuring equipment as well as automation of the gas pressure regulation and measurement station | 2019 |